CASE STUDIES


RLUH Main Building

Streamlined Control and Measurable Savings Achieved at RLUH Main Building

The Royal Liverpool University Hospital (RLUH) Main Building required a robust and integrated Building Management System (BMS) to ensure consistent performance across its complex, multi-use spaces. WISE Controls was tasked with modernising the existing infrastructure to improve system visibility, energy efficiency, and operational reliability.

Our solution included the installation of a unified BMS platform, advanced HVAC diagnostics, and comprehensive energy metering data retrieval. By centralising system control, the estates team can now monitor, manage, and optimise the hospital’s heating, ventilation, and critical services from a single interface.

Since implementation, RLUH has seen a measurable reduction in energy consumption, faster maintenance response times, and improved compliance with healthcare performance standards. The result is a smarter, more resilient building environment that supports both patient care and sustainability goals.

“Having worked with WISE controls for many years now, I can say without a doubt that Phil and Mia provide us with an outstanding service, they regularly go above and beyond to keep the Royal Liverpool Hospital site running while taking the time to educate our technicians in the many complex systems on-site.”

— B.R. Senior Estates Officer, LUHFT

Key Outcomes

Case Studies

Smart Solutions, Real-World Impact

Do you face any of these issues in your building?

Request an Energy Audit today and discover how our Building Management Solutions can optimise performance and save money.

Previous
Previous

RLUH Clinical Sciences Building

Next
Next

Edwards Building